s 日韩亚洲不卡线,色88久久久久高潮综合影院
中文 / English
         
        企業(yè)郵箱 招聘英才 聯(lián)系我們
        Home >  News Center >  CorporateNews

        Good Start in Production! DSIC Delivers the World First VLEC

          <acronym id="y2gef"></acronym>
          <tbody id="y2gef"></tbody>

          av中文天堂在线,视频一区二区三区在线观看,欧美精品日日鲁夜夜添,天天躁日日躁狠狠,97一期涩涩97片久久久久久久,亚洲色图自拍,人与鲁性猛交xxxx

          <delect id="y2gef"><pre id="y2gef"><rp id="y2gef"></rp></pre></delect>

            <tbody id="y2gef"></tbody>

            On Jan.15, 2019, the delivery ceremony for the world first 85000m3Very Large Ethane Carrier(VLEC) and keel laying ceremony were held in DSIC Offshore Engineering Company, where Jaccar Chairman York, DSIC leaders Liu Zheng and Yin Xuelin, and more than 100 guests domestic and abroad attended the ceremony.

             

            Smooth delivery of this VLEC marks that DSIC Offshore Engineering Company has successfully taken the first step in transformation of industrial structure, and turned in a satisfactory answer to successful construction of liquefied gas carrier with high tech, high challenge and high value added.

             

            85000m3VLEC is 231.6 m in length overall and 36.6 m in breadth, adopting Type C fluid tanks with the world max weight, dimension and capacity through the most advanced design of tri-lobe technology(3 lugs) to increase 20% loading volume. This carrier arranges two bunker tanks and fuel gas systems on deck, and configure the world first dual-fuel low-speed main engine in engine room, which takes ethane as M/E fuel in service voyage, and M/E running supplies power to the whole ship through shaft generator with higher economy. Meanwhile, its M/E is equipped with EGR, diesel generator with SCR and relevant water treatment system, sodium hydroxide system and urea system, etc., capable of sailing in the control zones with strict requirements in nitric oxide emission. Application of the above equipment and systems is the first in China up to now and only a few worldwide.

             

            From steel cutting to ship delivery, it has taken 19 months in total. From undocking of the whole ship to sea trial completion, it has taken 5 months, and her period of sea trial is 100 hours. Both inclining test and empty ship weighing has reached desired effect, loading capacity is fully up to standards, and data and parameters acquired in sea trial has not only met the stipulation of the contract, but also reflected outstanding performances.

            Address: 1 Yanhai Street, Dalian, Liaoning Province, China(To browse the contents, use IE6.0 or above)
            Copyright@2005 dsic.cn All Rights Reserved
            Tel: 86-411-84482888 Fax: 86-411-82633461 E-mail: dsic@dsic.cn
            遼ICP備06004983號 Technical Support: Shipol